Skip Navigation

Supporting strategies

A number of individual strategies have been prepared that have helped inform the development of the Local Transport Plan (LTP).

Each is led by one of the LTP authorities and has generally followed a common structure and format. In many cases these strategies are live documents and will be further developed during the next few months as the Coalition Government further develop its own transport policies or as further analytical work is undertaken. In other cases the strategies are yet to be developed.

Ultimately it is intended to have a full range of supporting strategies to the Local Transport Plan that consider in more detail the evidence available and contain action plans that set out to deliver the LTP objectives in the most efficient manner possible. The table below summarises the current status of each of these strategies and provides an indication of work to be undertaken in the next few months.

Local Transport Plan - supporting strategies

Supporting StrategiesLead AuthorityCurrent StatusTarget date for completion of strategy
Cycling Strategy (pdf, 1Mb) (opens in a new window)Bournemouth Borough Council (BBC)DraftApril 2014
Accessibility Strategy (pdf, 6Mb) (opens in a new window)BBCDraftApril 2014

Bournemouth, Poole and Dorset Local Transport Plan 3 Road Safety Strategy 2011-2026 (pdf, 347kb) (opens in a new window)

LTP 3 Road Safety Strategy 2011 - 2026 - Executive Summary (pdf, 23kb) (opens in a new window)

LTP3 Road Safety Strategy 2011 - 2026 - Action Plan (pdf, 35kb) (opens in a new window)

Dorset County Council (DCC)Final 
Health Strategy (pdf, 695kb) (opens in a new window)DCCDraftApril 2014
Low Carbon Travel Strategy (pdf, 815kb) (opens in a new window)DCCDraftApril 2014
Waterborne Transport Study (pdf, 13Mb) (opens in a new window)DCCDraftApril 2014
Freight Strategy Action Plan (pdf, 86kb) (opens in a new window)DCCFinal 
Freight Map (pdf, 446kb) (opens in a new window)DCCFinal 
A Transport Study to Support Sustainable Tourism (pdf, 940kb) (opens in a new window)BoPDraftApril 2014
Intelligent Transport Systems (pdf, 472kb) (opens in a new window)BoPDraftApril 2014
Motorcycle Policy (pdf, 593kb) (opens in a new window)BoPDraftApril 2014
Sustainable Modes of Travel to School Strategy (pdf, 511kb) (opens in a new window)JointFinal 

Rights of Way Improvement Plan (Bournemouth /Poole) (pdf, 1Mb) (opens in a new window)

BoP April 2014
Rights of Way Improvement Plan (Dorset) (pdf, 9Mb) (opens in a new window)DCCFinal 
Local Transport Plan - Supporting Evidence Base (pdf, 27Mb) (opens in a new window)DCCFinalisedApril 2014
Dorset Passenger Transport Strategy 2015 - 2026 (pdf, 676kb) (opens in a new window)DCCDraft May 2016

We are happy to receive comments on those strategies that still have a draft status. Comments should be made to ltp@dorsetcc.gov.uk, clearly stating which strategy is being commented upon.

Report and track road issues and enquiries

Stay connected - sign up to our free e-newsletter

Powered by GOSS iCM
Shampyle