Skip Navigation

West Dorset, Weymouth & Portland earlier consultations

This page contains links to databases and documents summarising the consultation that informed the adopted West Dorset, Weymouth and Portland Local Plan.

 

DateMilestoneKey ChangeSummary of Findings
February 2015

Consultation on Main Modifications to the Local Plan and CLG Household Projections

Consultation focused on Main Modifications arising from the Examination Hearing Sessions. Inspector also invites comments on implications (if any) of new household projections for the Local Plan.A summary  Main Modifications consultation (pdf, 1023kb) (opens in a new window) is available.
July 2014Consultation on  Further Proposed Changes (pdf, 99kb) (opens in a new window) (CD/SP5)Further Proposed Changes includes modifications to housing requirement, job numbers and the plan period.A summary  Further Proposed Changes consultation (pdf, 512kb) (opens in a new window) is available.
August 2013Consultation on proposed modifications (June 2013) shown as tracked changes (CD/SP2)Consultation focused on the modifications (tracked changes) only.The consultation responses were sent to the Planning Inspectorate to consider alongside the Local Plan.
January 2013Consultation on an  Alternative Strategy (pdf, 433kb) (opens in a new window) in response to Pre-Submission consultation (CD/CON10)To consult on a potential new housing site at Dorchester and reduced development on sites at Sherborne, Beaminster and Crossways.A summary of the findings from the Local Plan  Alternative Strategy Consultation Summary (pdf, 1Mb) (opens in a new window) is available.
November 2012 Alternative Sites Consultation (pdf, 5Mb) (opens in a new window) (CD/CON8)Consultation on additional sites submitted by consultees at Pre-Submission stage.A summary of the findings from the  Alternative Sites consultation (pdf, 737kb) (opens in a new window) is available.
June 2012Consultation on pre-submission draft local plan (CD/SP1)First published draft of the Local Plan.A summary of the   pre-submission consultation (pdf, 1Mb) (opens in a new window) is available.
Autumn 2011Extensive community and stakeholder consultationN/AA summary of the  Autumn 2011 Consultation (pdf, 1Mb) (opens in a new window) is available.

 

 

Powered by GOSS iCM
Shampyle